Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE4
SITE-SE4-00799
Industripark Väst AB – Lund. The control plane steers the whole site — not just the GPUs.
Location
Lund
Grid area SE4
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE4-00799
Site topology
Grid · import 37.4 kW
SITE-SE4-00799
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
25 kW
BASELINE · 25 kW
EV CHARGER
2 chargers
LIMIT · 7 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE4-00799-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 1.8 · utilPct 22 · tempC 22 · inUse 2 | COMPUTE |
| SITE-SE4-00799-GRID | GRID_CONNECTION | DSO 400 A main fuse | 276 kW | 276 kW | Industripark Väst AB | ONLINE | importKw 0 | — |
| SITE-SE4-00799-LOAD | BUILDING_LOAD | — Building load | 25 kW | 25 kW | Industripark Väst AB | ONLINE | powerKw 25 | PEAK_REDUCTION |
| SITE-SE4-00799-EV | EV_CHARGER | Zaptec 2 × 11 kW | 2 chargers | 22 kW | Industripark Väst AB | ONLINE | powerKw 10 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 154 kW
Option ARun compute2.99 SEK/kWh
Kraftnod Marketplace net 9.32 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.75 SEK/kWh
- Evening peak
- 1.88 SEK/kWh
- Battery SOC
- —
- Grid limit
- 179 kW
- Building load
- 25 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 25 kW |
| EV charging | LIMIT | 7 kW |
| Grid | IMPORT | 37.4 kW |
Site value
Compute11 004 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value11 004 SEK / month
Energy cost−674 SEK
Net site value10 330 SEK