Site · SE4

SITE-SE4-00799

Industripark Väst AB – Lund. The control plane steers the whole site — not just the GPUs.

Location
Lund
Grid area SE4
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE4-00799

Site topology

Grid · import 37.4 kW
SITE-SE4-00799
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
25 kW
BASELINE · 25 kW
EV CHARGER
2 chargers
LIMIT · 7 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00799-GPUGPU_CLUSTERNVIDIA L40S8 GPU6 kWKraftnod AssetCo 01ONLINEpowerKw 1.8 · utilPct 22 · tempC 22 · inUse 2COMPUTE
SITE-SE4-00799-GRIDGRID_CONNECTIONDSO 400 A main fuse276 kW276 kWIndustripark Väst ABONLINEimportKw 0—
SITE-SE4-00799-LOADBUILDING_LOAD— Building load25 kW25 kWIndustripark Väst ABONLINEpowerKw 25PEAK_REDUCTION
SITE-SE4-00799-EVEV_CHARGERZaptec 2 × 11 kW2 chargers22 kWIndustripark Väst ABONLINEpowerKw 10PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 154 kW
Option ARun compute2.99 SEK/kWh
Kraftnod Marketplace net 9.32 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
—
Grid limit
179 kW
Building load
25 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE25 kW
EV chargingLIMIT7 kW
GridIMPORT37.4 kW

Site value

Last 30 days · simulated
Compute11 004 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value11 004 SEK / month
Energy cost−674 SEK
Net site value10 330 SEK