Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE4
SITE-SE4-00778
Example Fastigheter AB – Helsingborg. The control plane steers the whole site — not just the GPUs.
Location
Helsingborg
Grid area SE4
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Example Fastigheter AB
Agent AGENT-SE4-00778
Site topology
Grid · import 73.4 kW
SITE-SE4-00778
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
42 kW
BASELINE · 42 kW
SOLAR
40 kWp
IDLE · 0 kW
EV CHARGER
8 chargers
LIMIT · 26 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE4-00778-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 4.8 · utilPct 84 · tempC 22 · inUse 7 | COMPUTE |
| SITE-SE4-00778-GRID | GRID_CONNECTION | DSO 250 A main fuse | 173 kW | 173 kW | Example Fastigheter AB | ONLINE | importKw 0 | — |
| SITE-SE4-00778-LOAD | BUILDING_LOAD | — Building load | 42 kW | 42 kW | Example Fastigheter AB | ONLINE | powerKw 42 | PEAK_REDUCTION |
| SITE-SE4-00778-PV | SOLAR | SMA 40 kWp array | 40 kWp | 40 kW | Example Fastigheter AB | ONLINE | powerKw 0 | SPOT_ENERGY |
| SITE-SE4-00778-EV | EV_CHARGER | Zaptec 8 × 11 kW | 8 chargers | 88 kW | Example Fastigheter AB | ONLINE | powerKw 9 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 70 kW
Option ARun compute2.99 SEK/kWh
Kraftnod Marketplace net 9.32 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.75 SEK/kWh
- Evening peak
- 1.88 SEK/kWh
- Battery SOC
- —
- Grid limit
- 112 kW
- Building load
- 42 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 42 kW |
| Solar | IDLE | 0 kW |
| EV charging | LIMIT | 26 kW |
| Grid | IMPORT | 73.4 kW |
Site value
Compute38 381 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization507 SEK
Total site value38 888 SEK / month
Energy cost−1 440 SEK
Net site value37 448 SEK