Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00743

Industripark Väst AB – Helsingborg. The control plane steers the whole site — not just the GPUs.

Location
Helsingborg
Grid area SE4
Grid connection
160 A
72 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE4-00743

Site topology

Grid · import 56.4 kW
SITE-SE4-00743
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
51 kW
BASELINE · 51 kW
BATTERY
200 kWh
IDLE · 0 kW
SOLAR
150 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00743-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada8 GPU6 kWFinance Partner Fund IONLINEpowerKw 2.4 · utilPct 34 · tempC 15 · inUse 3COMPUTE
SITE-SE4-00743-GRIDGRID_CONNECTIONDSO 160 A main fuse110 kW110 kWIndustripark Väst ABONLINEimportKw 0—
SITE-SE4-00743-LOADBUILDING_LOAD— Building load51 kW51 kWIndustripark Väst ABONLINEpowerKw 51PEAK_REDUCTION
SITE-SE4-00743-BATBATTERYHuawei 200 kWh LFP200 kWh100 kWIndustripark Väst ABONLINEsocPct 42 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY
SITE-SE4-00743-PVSOLARSMA 150 kWp array150 kWp150 kWIndustripark Väst ABONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 21 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option BCharge battery0.99 SEK/kWh
Shift to evening peak 1.88 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.93 SEK/kWh
FCR 483 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
42%
Grid limit
72 kW
Building load
51 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE51 kW
BatteryIDLE0 kW
SolarIDLE0 kW
GridIMPORT56.4 kW

Site value

Last 30 days · simulated
Compute14 805 SEK
Battery flex30 808 SEK
Peak reduction7 016 SEK
Solar optimization2 026 SEK
Total site value54 655 SEK / month
Energy cost−656 SEK
Net site value53 999 SEK