Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00715

Residence Växjö. The control plane steers the whole site — not just the GPUs.

Location
Växjö
Grid area SE4
Grid connection
26 A
12 kW available
Internet
Fiber 1 Gbit
Site owner
Privat host
Agent AGENT-SE4-00715

Site topology

Grid · import 3.7 kW
SITE-SE4-00715
GPU CLUSTER
1 GPU
POWER_CAP · 0.7 kW
BUILDING LOAD
3 kW
BASELINE · 3 kW
BATTERY
15 kWh
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00715-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada1 GPU0.8 kWFinance Partner Fund ICURTAILEDpowerKw 0.1 · utilPct 0 · tempC 19 · inUse 0COMPUTE
SITE-SE4-00715-GRIDGRID_CONNECTIONDSO 26 A main fuse18 kW18 kWPrivat hostONLINEimportKw 0—
SITE-SE4-00715-LOADBUILDING_LOAD— Building load3 kW3 kWPrivat hostONLINEpowerKw 3PEAK_REDUCTION
SITE-SE4-00715-BATBATTERYBYD 15 kWh LFP15 kWh8 kWPrivat hostONLINEsocPct 47 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 9 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option BCharge battery0.99 SEK/kWh
Shift to evening peak 1.88 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.93 SEK/kWh
FCR 483 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
47%
Grid limit
12 kW
Building load
3 kW

Dispatch

AssetActionPower
GPU clusterPOWER_CAP0.7 kW
Building loadBASELINE3 kW
BatteryIDLE0 kW
GridIMPORT3.7 kW

Site value

Last 30 days · simulated
Compute0 SEK
Battery flex2 240 SEK
Peak reduction509 SEK
Solar optimization0 SEK
Total site value2 749 SEK / month
Energy cost−−0 SEK
Net site value2 749 SEK