Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00652

Kommunfastigheter AB – Helsingborg. The control plane steers the whole site — not just the GPUs.

Location
Helsingborg
Grid area SE4
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE4-00652

Site topology

Grid · import 81.4 kW
SITE-SE4-00652
GPU CLUSTER
8 GPU
POWER_CAP · 5.4 kW
BUILDING LOAD
69 kW
BASELINE · 69 kW
SOLAR
40 kWp
IDLE · 0 kW
EV CHARGER
2 chargers
LIMIT · 7 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00652-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada8 GPU6 kWFinance Partner Fund ICURTAILEDpowerKw 0.7 · utilPct 0 · tempC 25 · inUse 0COMPUTE
SITE-SE4-00652-GRIDGRID_CONNECTIONDSO 400 A main fuse276 kW276 kWKommunfastigheter ABONLINEimportKw 0—
SITE-SE4-00652-LOADBUILDING_LOAD— Building load69 kW69 kWKommunfastigheter ABONLINEpowerKw 69PEAK_REDUCTION
SITE-SE4-00652-PVSOLARSolis 40 kWp array40 kWp40 kWKommunfastigheter ABONLINEpowerKw 0SPOT_ENERGY
SITE-SE4-00652-EVEV_CHARGERZaptec 2 × 11 kW2 chargers22 kWKommunfastigheter ABONLINEpowerKw 12PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 110 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
—
Grid limit
179 kW
Building load
69 kW

Dispatch

AssetActionPower
GPU clusterPOWER_CAP5.4 kW
Building loadBASELINE69 kW
SolarIDLE0 kW
EV chargingLIMIT7 kW
GridIMPORT81.4 kW

Site value

Last 30 days · simulated
Compute0 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization564 SEK
Total site value564 SEK / month
Energy cost−−0 SEK
Net site value564 SEK