Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00645

Residence Kalmar. The control plane steers the whole site — not just the GPUs.

Location
Kalmar
Grid area SE4
Grid connection
26 A
12 kW available
Internet
Fiber 1 Gbit
Site owner
Privat host
Agent AGENT-SE4-00645

Site topology

Grid · import 4.7 kW
SITE-SE4-00645
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
2 kW
BASELINE · 2 kW
SOLAR
10 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00645-GPUGPU_CLUSTERNVIDIA L40S4 GPU3 kWKraftnod AssetCo 02ONLINEpowerKw 1.1 · utilPct 31 · tempC 25 · inUse 1COMPUTE
SITE-SE4-00645-GRIDGRID_CONNECTIONDSO 26 A main fuse18 kW18 kWPrivat hostONLINEimportKw 0—
SITE-SE4-00645-LOADBUILDING_LOAD— Building load2 kW2 kWPrivat hostONLINEpowerKw 2PEAK_REDUCTION
SITE-SE4-00645-PVSOLARSMA 10 kWp array10 kWp10 kWPrivat hostONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 10 kW
Option ARun compute2.99 SEK/kWh
Kraftnod Marketplace net 9.32 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
—
Grid limit
12 kW
Building load
2 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE2 kW
SolarIDLE0 kW
GridIMPORT4.7 kW

Site value

Last 30 days · simulated
Compute5 278 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization127 SEK
Total site value5 405 SEK / month
Energy cost−339 SEK
Net site value5 066 SEK