← Sites
Simulated
Last 30 days · simulated
Site · SE4
SITE-SE4-00631
Nordisk Logistik AB – Växjö. The control plane steers the whole site — not just the GPUs.
Location
Växjö
Grid area SE4
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE4-00631
Site topology
Grid · import 36.4 kW
SITE-SE4-00631
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
31 kW
BASELINE · 31 kW
BATTERY
200 kWh
IDLE · 0 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE4-00631-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Finance Partner Fund I | ONLINE | powerKw 4 · utilPct 68 · tempC 23 · inUse 5 | COMPUTE |
| SITE-SE4-00631-GRID | GRID_CONNECTION | DSO 250 A main fuse | 173 kW | 173 kW | Nordisk Logistik AB | ONLINE | importKw 0 | — |
| SITE-SE4-00631-LOAD | BUILDING_LOAD | — Building load | 31 kW | 31 kW | Nordisk Logistik AB | ONLINE | powerKw 31 | PEAK_REDUCTION |
| SITE-SE4-00631-BAT | BATTERY | Dyness 200 kWh LFP | 200 kWh | 100 kW | Nordisk Logistik AB | ONLINE | socPct 57 · powerKw 0 · mode idle | FCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 81 kW
Option ARun compute2.99 SEK/kWh
Kraftnod Marketplace net 9.32 SEK/GPU-h × demand 28%
Option BCharge battery0.99 SEK/kWh
Shift to evening peak 1.88 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.93 SEK/kWh
FCR 483 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.75 SEK/kWh
- Evening peak
- 1.88 SEK/kWh
- Battery SOC
- 57%
- Grid limit
- 112 kW
- Building load
- 31 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 31 kW |
| Battery | IDLE | 0 kW |
| Grid | IMPORT | 36.4 kW |
Site value
Compute27 040 SEK
Battery flex30 226 SEK
Peak reduction6 883 SEK
Solar optimization0 SEK
Total site value64 149 SEK / month
Energy cost−1 107 SEK
Net site value63 042 SEK