Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00603

Example Fastigheter AB – Växjö. The control plane steers the whole site — not just the GPUs.

Location
Växjö
Grid area SE4
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Example Fastigheter AB
Agent AGENT-SE4-00603

Site topology

Grid · import 78.7 kW
SITE-SE4-00603
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
50 kW
BASELINE · 50 kW
BATTERY
200 kWh
IDLE · 0 kW
EV CHARGER
8 chargers
LIMIT · 26 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00603-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell4 GPU3 kWFinance Partner Fund IONLINEpowerKw 1.1 · utilPct 30 · tempC 18 · inUse 1COMPUTE
SITE-SE4-00603-GRIDGRID_CONNECTIONDSO 250 A main fuse173 kW173 kWExample Fastigheter ABONLINEimportKw 0—
SITE-SE4-00603-LOADBUILDING_LOAD— Building load50 kW50 kWExample Fastigheter ABONLINEpowerKw 50PEAK_REDUCTION
SITE-SE4-00603-BATBATTERYBYD 200 kWh LFP200 kWh100 kWExample Fastigheter ABONLINEsocPct 54 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY
SITE-SE4-00603-EVEV_CHARGEREasee 8 × 11 kW8 chargers88 kWExample Fastigheter ABONLINEpowerKw 26PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 62 kW
Option ARun compute6.21 SEK/kWh
Kraftnod Marketplace net 14.54 SEK/GPU-h × demand 35%
Option BCharge battery0.99 SEK/kWh
Shift to evening peak 1.88 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.93 SEK/kWh
FCR 483 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
54%
Grid limit
112 kW
Building load
50 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE50 kW
BatteryIDLE0 kW
EV chargingLIMIT26 kW
GridIMPORT78.7 kW

Site value

Last 30 days · simulated
Compute9 044 SEK
Battery flex28 971 SEK
Peak reduction6 599 SEK
Solar optimization0 SEK
Total site value44 614 SEK / month
Energy cost−400 SEK
Net site value44 214 SEK