Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00589

Kommunfastigheter AB – Helsingborg. The control plane steers the whole site — not just the GPUs.

Location
Helsingborg
Grid area SE4
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE4-00589

Site topology

Grid · import 27.4 kW
SITE-SE4-00589
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
22 kW
BASELINE · 22 kW
SOLAR
150 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00589-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada8 GPU6 kWKraftnod AssetCo 01ONLINEpowerKw 4 · utilPct 68 · tempC 18 · inUse 5COMPUTE
SITE-SE4-00589-GRIDGRID_CONNECTIONDSO 125 A main fuse86 kW86 kWKommunfastigheter ABONLINEimportKw 0—
SITE-SE4-00589-LOADBUILDING_LOAD— Building load22 kW22 kWKommunfastigheter ABONLINEpowerKw 22PEAK_REDUCTION
SITE-SE4-00589-PVSOLARFronius 150 kWp array150 kWp150 kWKommunfastigheter ABONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 34 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
—
Grid limit
56 kW
Building load
22 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE22 kW
SolarIDLE0 kW
GridIMPORT27.4 kW

Site value

Last 30 days · simulated
Compute26 691 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization2 053 SEK
Total site value28 744 SEK / month
Energy cost−1 232 SEK
Net site value27 512 SEK