Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE4
SITE-SE4-00589
Kommunfastigheter AB – Helsingborg. The control plane steers the whole site — not just the GPUs.
Location
Helsingborg
Grid area SE4
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE4-00589
Site topology
Grid · import 27.4 kW
SITE-SE4-00589
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
22 kW
BASELINE · 22 kW
SOLAR
150 kWp
IDLE · 0 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE4-00589-GPU | GPU_CLUSTER | NVIDIA RTX 6000 Ada | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 4 · utilPct 68 · tempC 18 · inUse 5 | COMPUTE |
| SITE-SE4-00589-GRID | GRID_CONNECTION | DSO 125 A main fuse | 86 kW | 86 kW | Kommunfastigheter AB | ONLINE | importKw 0 | — |
| SITE-SE4-00589-LOAD | BUILDING_LOAD | — Building load | 22 kW | 22 kW | Kommunfastigheter AB | ONLINE | powerKw 22 | PEAK_REDUCTION |
| SITE-SE4-00589-PV | SOLAR | Fronius 150 kWp array | 150 kWp | 150 kW | Kommunfastigheter AB | ONLINE | powerKw 0 | SPOT_ENERGY |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 34 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.75 SEK/kWh
- Evening peak
- 1.88 SEK/kWh
- Battery SOC
- —
- Grid limit
- 56 kW
- Building load
- 22 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 22 kW |
| Solar | IDLE | 0 kW |
| Grid | IMPORT | 27.4 kW |
Site value
Compute26 691 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization2 053 SEK
Total site value28 744 SEK / month
Energy cost−1 232 SEK
Net site value27 512 SEK