Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE4

SITE-SE4-00575

Example Fastigheter AB – Lund. The control plane steers the whole site — not just the GPUs.

Location
Lund
Grid area SE4
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Example Fastigheter AB
Agent AGENT-SE4-00575

Site topology

Grid · import 26.7 kW
SITE-SE4-00575
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
24 kW
BASELINE · 24 kW
SOLAR
150 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00575-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada4 GPU3 kWKraftnod AssetCo 01ONLINEpowerKw 1.8 · utilPct 61 · tempC 22 · inUse 2COMPUTE
SITE-SE4-00575-GRIDGRID_CONNECTIONDSO 125 A main fuse86 kW86 kWExample Fastigheter ABONLINEimportKw 0—
SITE-SE4-00575-LOADBUILDING_LOAD— Building load24 kW24 kWExample Fastigheter ABONLINEpowerKw 24PEAK_REDUCTION
SITE-SE4-00575-PVSOLARFronius 150 kWp array150 kWp150 kWExample Fastigheter ABONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 32 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
—
Grid limit
56 kW
Building load
24 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE24 kW
SolarIDLE0 kW
GridIMPORT26.7 kW

Site value

Last 30 days · simulated
Compute9 572 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization2 113 SEK
Total site value11 685 SEK / month
Energy cost−496 SEK
Net site value11 189 SEK