Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE4
SITE-SE4-00540
Handelshuset AB – Kalmar. The control plane steers the whole site — not just the GPUs.
Location
Kalmar
Grid area SE4
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Handelshuset AB
Agent AGENT-SE4-00540
Site topology
Grid · import 65.7 kW
SITE-SE4-00540
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
63 kW
BASELINE · 63 kW
SOLAR
80 kWp
IDLE · 0 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE4-00540-GPU | GPU_CLUSTER | NVIDIA RTX 6000 Ada | 4 GPU | 3 kW | Finance Partner Fund I | ONLINE | powerKw 1.2 · utilPct 35 · tempC 15 · inUse 1 | COMPUTE |
| SITE-SE4-00540-GRID | GRID_CONNECTION | DSO 400 A main fuse | 276 kW | 276 kW | Handelshuset AB | ONLINE | importKw 0 | — |
| SITE-SE4-00540-LOAD | BUILDING_LOAD | — Building load | 63 kW | 63 kW | Handelshuset AB | ONLINE | powerKw 63 | PEAK_REDUCTION |
| SITE-SE4-00540-PV | SOLAR | SMA 80 kWp array | 80 kWp | 80 kW | Handelshuset AB | ONLINE | powerKw 0 | SPOT_ENERGY |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 116 kW
Option ARun compute3.21 SEK/kWh
Kraftnod Marketplace net 8.28 SEK/GPU-h × demand 34%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.75 SEK/kWh
- Evening peak
- 1.88 SEK/kWh
- Battery SOC
- —
- Grid limit
- 179 kW
- Building load
- 63 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 2.7 kW |
| Building load | BASELINE | 63 kW |
| Solar | IDLE | 0 kW |
| Grid | IMPORT | 65.7 kW |
Site value
Compute4 818 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization1 061 SEK
Total site value5 879 SEK / month
Energy cost−387 SEK
Net site value5 492 SEK