Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE4
SITE-SE4-00456
Nordisk Logistik AB – Växjö. The control plane steers the whole site — not just the GPUs.
Location
Växjö
Grid area SE4
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE4-00456
Site topology
Grid · import 52.7 kW
SITE-SE4-00456
GPU CLUSTER
4 GPU
POWER_CAP · 2.7 kW
BUILDING LOAD
50 kW
BASELINE · 50 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE4-00456-GPU | GPU_CLUSTER | NVIDIA RTX PRO 6000 Blackwell | 4 GPU | 3 kW | Finance Partner Fund I | CURTAILED | powerKw 0.4 · utilPct 0 · tempC 18 · inUse 0 | COMPUTE |
| SITE-SE4-00456-GRID | GRID_CONNECTION | DSO 125 A main fuse | 86 kW | 86 kW | Nordisk Logistik AB | ONLINE | importKw 0 | — |
| SITE-SE4-00456-LOAD | BUILDING_LOAD | — Building load | 50 kW | 50 kW | Nordisk Logistik AB | ONLINE | powerKw 50 | PEAK_REDUCTION |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 6 kW
Option ARun compute6.21 SEK/kWh
Kraftnod Marketplace net 14.54 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.75 SEK/kWh
- Evening peak
- 1.88 SEK/kWh
- Battery SOC
- —
- Grid limit
- 56 kW
- Building load
- 50 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | POWER_CAP | 2.7 kW |
| Building load | BASELINE | 50 kW |
| Grid | IMPORT | 52.7 kW |
Site value
Compute0 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value0 SEK / month
Energy cost−−0 SEK
Net site value0 SEK