Kommunfastigheter AB – Kalmar. The control plane steers the whole site — not just the GPUs.

Location
Kalmar
Grid area SE4
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE4-00435

Site topology

Grid · import 36.7 kW
SITE-SE4-00435
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
34 kW
BASELINE · 34 kW
BATTERY
200 kWh
IDLE · 0 kW
SOLAR
40 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE4-00435-GPUGPU_CLUSTERNVIDIA L40S4 GPU3 kWKraftnod AssetCo 01ONLINEpowerKw 0.9 · utilPct 22 · tempC 19 · inUse 1COMPUTE
SITE-SE4-00435-GRIDGRID_CONNECTIONDSO 125 A main fuse86 kW86 kWKommunfastigheter ABONLINEimportKw 0—
SITE-SE4-00435-LOADBUILDING_LOAD— Building load34 kW34 kWKommunfastigheter ABONLINEpowerKw 34PEAK_REDUCTION
SITE-SE4-00435-BATBATTERYDyness 200 kWh LFP200 kWh100 kWKommunfastigheter ABONLINEsocPct 78 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY
SITE-SE4-00435-PVSOLARSolis 40 kWp array40 kWp40 kWKommunfastigheter ABONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 22 kW
Option ARun compute2.99 SEK/kWh
Kraftnod Marketplace net 9.32 SEK/GPU-h × demand 28%
Option BCharge battery0.99 SEK/kWh
Shift to evening peak 1.88 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.93 SEK/kWh
FCR 483 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.75 SEK/kWh
Evening peak
1.88 SEK/kWh
Battery SOC
78%
Grid limit
56 kW
Building load
34 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE34 kW
BatteryIDLE0 kW
SolarIDLE0 kW
GridIMPORT36.7 kW

Site value

Last 30 days · simulated
Compute5 519 SEK
Battery flex28 487 SEK
Peak reduction6 487 SEK
Solar optimization568 SEK
Total site value41 061 SEK / month
Energy cost−233 SEK
Net site value40 828 SEK