Site · SE3

SITE-SE3-00757

Industripark Väst AB – Jönköping. The control plane steers the whole site — not just the GPUs.

Location
Jönköping
Grid area SE3
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE3-00757

Site topology

Grid · import 93.7 kW
SITE-SE3-00757
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
65 kW
BASELINE · 65 kW
BATTERY
400 kWh
IDLE · 0 kW
SOLAR
40 kWp
IDLE · 0 kW
EV CHARGER
8 chargers
LIMIT · 26 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00757-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell4 GPU3 kWKraftnod AssetCo 02ONLINEpowerKw 1.4 · utilPct 42 · tempC 21 · inUse 2COMPUTE
SITE-SE3-00757-GRIDGRID_CONNECTIONDSO 125 A main fuse86 kW86 kWIndustripark Väst ABONLINEimportKw 0—
SITE-SE3-00757-LOADBUILDING_LOAD— Building load65 kW65 kWIndustripark Väst ABONLINEpowerKw 65PEAK_REDUCTION
SITE-SE3-00757-BATBATTERYDyness 400 kWh LFP400 kWh200 kWIndustripark Väst ABONLINEsocPct 52 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY
SITE-SE3-00757-PVSOLARSolis 40 kWp array40 kWp40 kWIndustripark Väst ABONLINEpowerKw 0SPOT_ENERGY
SITE-SE3-00757-EVEV_CHARGEREasee 8 × 11 kW8 chargers88 kWIndustripark Väst ABONLINEpowerKw 40PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 0 kW
Option ARun compute6.42 SEK/kWh
Kraftnod Marketplace net 14.7 SEK/GPU-h × demand 35%
Option BCharge battery0.71 SEK/kWh
Shift to evening peak 1.35 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.68 SEK/kWh
FCR 420 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
52%
Grid limit
56 kW
Building load
65 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE65 kW
BatteryIDLE0 kW
SolarIDLE0 kW
EV chargingLIMIT26 kW
GridIMPORT93.7 kW

Site value

Last 30 days · simulated
Compute17 453 SEK
Battery flex51 223 SEK
Peak reduction13 416 SEK
Solar optimization528 SEK
Total site value82 620 SEK / month
Energy cost−338 SEK
Net site value82 282 SEK