Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE3

SITE-SE3-00680

Nordisk Logistik AB – Linköping. The control plane steers the whole site — not just the GPUs.

Location
Linköping
Grid area SE3
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE3-00680

Site topology

Grid · import 77.4 kW
SITE-SE3-00680
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
72 kW
BASELINE · 72 kW
BATTERY
400 kWh
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00680-GPUGPU_CLUSTERNVIDIA L40S8 GPU6 kWFinance Partner Fund IONLINEpowerKw 3.5 · utilPct 57 · tempC 25 · inUse 5COMPUTE
SITE-SE3-00680-GRIDGRID_CONNECTIONDSO 250 A main fuse173 kW173 kWNordisk Logistik ABONLINEimportKw 0—
SITE-SE3-00680-LOADBUILDING_LOAD— Building load72 kW72 kWNordisk Logistik ABONLINEpowerKw 72PEAK_REDUCTION
SITE-SE3-00680-BATBATTERYBYD 400 kWh LFP400 kWh200 kWNordisk Logistik ABONLINEsocPct 30 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 40 kW
Option ARun compute3.20 SEK/kWh
Kraftnod Marketplace net 9.47 SEK/GPU-h × demand 28%
Option BCharge battery0.71 SEK/kWh
Shift to evening peak 1.35 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.68 SEK/kWh
FCR 420 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
30%
Grid limit
112 kW
Building load
72 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE72 kW
BatteryIDLE0 kW
GridIMPORT77.4 kW

Site value

Last 30 days · simulated
Compute29 568 SEK
Battery flex52 399 SEK
Peak reduction13 724 SEK
Solar optimization0 SEK
Total site value95 691 SEK / month
Energy cost−819 SEK
Net site value94 872 SEK