Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE3
SITE-SE3-00680
Nordisk Logistik AB – Linköping. The control plane steers the whole site — not just the GPUs.
Location
Linköping
Grid area SE3
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE3-00680
Site topology
Grid · import 77.4 kW
SITE-SE3-00680
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
72 kW
BASELINE · 72 kW
BATTERY
400 kWh
IDLE · 0 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE3-00680-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Finance Partner Fund I | ONLINE | powerKw 3.5 · utilPct 57 · tempC 25 · inUse 5 | COMPUTE |
| SITE-SE3-00680-GRID | GRID_CONNECTION | DSO 250 A main fuse | 173 kW | 173 kW | Nordisk Logistik AB | ONLINE | importKw 0 | — |
| SITE-SE3-00680-LOAD | BUILDING_LOAD | — Building load | 72 kW | 72 kW | Nordisk Logistik AB | ONLINE | powerKw 72 | PEAK_REDUCTION |
| SITE-SE3-00680-BAT | BATTERY | BYD 400 kWh LFP | 400 kWh | 200 kW | Nordisk Logistik AB | ONLINE | socPct 30 · powerKw 0 · mode idle | FCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 40 kW
Option ARun compute3.20 SEK/kWh
Kraftnod Marketplace net 9.47 SEK/GPU-h × demand 28%
Option BCharge battery0.71 SEK/kWh
Shift to evening peak 1.35 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.68 SEK/kWh
FCR 420 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.54 SEK/kWh
- Evening peak
- 1.35 SEK/kWh
- Battery SOC
- 30%
- Grid limit
- 112 kW
- Building load
- 72 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 72 kW |
| Battery | IDLE | 0 kW |
| Grid | IMPORT | 77.4 kW |
Site value
Compute29 568 SEK
Battery flex52 399 SEK
Peak reduction13 724 SEK
Solar optimization0 SEK
Total site value95 691 SEK / month
Energy cost−819 SEK
Net site value94 872 SEK
