Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE3

SITE-SE3-00666

Residence Uppsala. The control plane steers the whole site — not just the GPUs.

Location
Uppsala
Grid area SE3
Grid connection
26 A
12 kW available
Internet
Fiber 1 Gbit
Site owner
Privat host
Agent AGENT-SE3-00666

Site topology

Grid · import 3.7 kW
SITE-SE3-00666
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
1 kW
BASELINE · 1 kW
SOLAR
12 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00666-GPUGPU_CLUSTERNVIDIA L40S4 GPU3 kWHost-ownedONLINEpowerKw 2.1 · utilPct 71 · tempC 25 · inUse 3COMPUTE
SITE-SE3-00666-GRIDGRID_CONNECTIONDSO 26 A main fuse18 kW18 kWPrivat hostONLINEimportKw 0—
SITE-SE3-00666-LOADBUILDING_LOAD— Building load1 kW1 kWPrivat hostONLINEpowerKw 1PEAK_REDUCTION
SITE-SE3-00666-PVSOLARSMA 12 kWp array12 kWp12 kWPrivat hostONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 11 kW
Option ARun compute3.20 SEK/kWh
Kraftnod Marketplace net 9.47 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
—
Grid limit
12 kW
Building load
1 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE1 kW
SolarIDLE0 kW
GridIMPORT3.7 kW

Site value

Last 30 days · simulated
Compute15 945 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization153 SEK
Total site value16 098 SEK / month
Energy cost−497 SEK
Net site value15 601 SEK