Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE3

SITE-SE3-00659

Handelshuset AB – Göteborg. The control plane steers the whole site — not just the GPUs.

Location
Göteborg
Grid area SE3
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Handelshuset AB
Agent AGENT-SE3-00659

Site topology

Grid · import 41.4 kW
SITE-SE3-00659
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
29 kW
BASELINE · 29 kW
SOLAR
80 kWp
IDLE · 0 kW
EV CHARGER
2 chargers
LIMIT · 7 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00659-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell8 GPU6 kWFinance Partner Fund IONLINEpowerKw 1.1 · utilPct 8 · tempC 24 · inUse 1COMPUTE
SITE-SE3-00659-GRIDGRID_CONNECTIONDSO 400 A main fuse276 kW276 kWHandelshuset ABONLINEimportKw 0—
SITE-SE3-00659-LOADBUILDING_LOAD— Building load29 kW29 kWHandelshuset ABONLINEpowerKw 29PEAK_REDUCTION
SITE-SE3-00659-PVSOLARSMA 80 kWp array80 kWp80 kWHandelshuset ABONLINEpowerKw 0SPOT_ENERGY
SITE-SE3-00659-EVEV_CHARGEREasee 2 × 11 kW2 chargers22 kWHandelshuset ABONLINEpowerKw 3PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 150 kW
Option ARun compute6.42 SEK/kWh
Kraftnod Marketplace net 14.7 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
—
Grid limit
179 kW
Building load
29 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE29 kW
SolarIDLE0 kW
EV chargingLIMIT7 kW
GridIMPORT41.4 kW

Site value

Last 30 days · simulated
Compute8 700 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization1 062 SEK
Total site value9 762 SEK / month
Energy cost−273 SEK
Net site value9 489 SEK