Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE3
SITE-SE3-00610
Nordisk Logistik AB – Göteborg. The control plane steers the whole site — not just the GPUs.
Location
Göteborg
Grid area SE3
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE3-00610
Site topology
Grid · import 28.4 kW
SITE-SE3-00610
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
23 kW
BASELINE · 23 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE3-00610-GPU | GPU_CLUSTER | NVIDIA RTX PRO 6000 Blackwell | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 2.5 · utilPct 37 · tempC 19 · inUse 3 | COMPUTE |
| SITE-SE3-00610-GRID | GRID_CONNECTION | DSO 250 A main fuse | 173 kW | 173 kW | Nordisk Logistik AB | ONLINE | importKw 0 | — |
| SITE-SE3-00610-LOAD | BUILDING_LOAD | — Building load | 23 kW | 23 kW | Nordisk Logistik AB | ONLINE | powerKw 23 | PEAK_REDUCTION |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 89 kW
Option ARun compute6.42 SEK/kWh
Kraftnod Marketplace net 14.7 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.54 SEK/kWh
- Evening peak
- 1.35 SEK/kWh
- Battery SOC
- —
- Grid limit
- 112 kW
- Building load
- 23 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 23 kW |
| Grid | IMPORT | 28.4 kW |
Site value
Compute26 865 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value26 865 SEK / month
Energy cost−731 SEK
Net site value26 134 SEK