Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE3

SITE-SE3-00610

Nordisk Logistik AB – Göteborg. The control plane steers the whole site — not just the GPUs.

Location
Göteborg
Grid area SE3
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE3-00610

Site topology

Grid · import 28.4 kW
SITE-SE3-00610
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
23 kW
BASELINE · 23 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00610-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell8 GPU6 kWKraftnod AssetCo 01ONLINEpowerKw 2.5 · utilPct 37 · tempC 19 · inUse 3COMPUTE
SITE-SE3-00610-GRIDGRID_CONNECTIONDSO 250 A main fuse173 kW173 kWNordisk Logistik ABONLINEimportKw 0—
SITE-SE3-00610-LOADBUILDING_LOAD— Building load23 kW23 kWNordisk Logistik ABONLINEpowerKw 23PEAK_REDUCTION

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 89 kW
Option ARun compute6.42 SEK/kWh
Kraftnod Marketplace net 14.7 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
—
Grid limit
112 kW
Building load
23 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE23 kW
GridIMPORT28.4 kW

Site value

Last 30 days · simulated
Compute26 865 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value26 865 SEK / month
Energy cost−731 SEK
Net site value26 134 SEK