Site · SE3

SITE-SE3-00554

Nordisk Logistik AB – Örebro. The control plane steers the whole site — not just the GPUs.

Location
Örebro
Grid area SE3
Grid connection
160 A
72 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE3-00554

Site topology

Grid · import 70.4 kW
SITE-SE3-00554
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
58 kW
BASELINE · 58 kW
SOLAR
40 kWp
IDLE · 0 kW
EV CHARGER
2 chargers
LIMIT · 7 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00554-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell8 GPU6 kWKraftnod AssetCo 02ONLINEpowerKw 3.2 · utilPct 51 · tempC 24 · inUse 4COMPUTE
SITE-SE3-00554-GRIDGRID_CONNECTIONDSO 160 A main fuse110 kW110 kWNordisk Logistik ABONLINEimportKw 0—
SITE-SE3-00554-LOADBUILDING_LOAD— Building load58 kW58 kWNordisk Logistik ABONLINEpowerKw 58PEAK_REDUCTION
SITE-SE3-00554-PVSOLARSolis 40 kWp array40 kWp40 kWNordisk Logistik ABONLINEpowerKw 0SPOT_ENERGY
SITE-SE3-00554-EVEV_CHARGEREasee 2 × 11 kW2 chargers22 kWNordisk Logistik ABONLINEpowerKw 10PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 14 kW
Option ARun compute6.42 SEK/kWh
Kraftnod Marketplace net 14.7 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
—
Grid limit
72 kW
Building load
58 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE58 kW
SolarIDLE0 kW
EV chargingLIMIT7 kW
GridIMPORT70.4 kW

Site value

Last 30 days · simulated
Compute35 935 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization563 SEK
Total site value36 498 SEK / month
Energy cost−774 SEK
Net site value35 724 SEK