Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE3

SITE-SE3-00547

Kommunfastigheter AB – Borås. The control plane steers the whole site — not just the GPUs.

Location
Borås
Grid area SE3
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE3-00547

Site topology

Grid · import 41.4 kW
SITE-SE3-00547
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
36 kW
BASELINE · 36 kW
SOLAR
40 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00547-GPUGPU_CLUSTERNVIDIA L40S8 GPU6 kWKraftnod AssetCo 02ONLINEpowerKw 4.3 · utilPct 74 · tempC 19 · inUse 6COMPUTE
SITE-SE3-00547-GRIDGRID_CONNECTIONDSO 250 A main fuse173 kW173 kWKommunfastigheter ABONLINEimportKw 0—
SITE-SE3-00547-LOADBUILDING_LOAD— Building load36 kW36 kWKommunfastigheter ABONLINEpowerKw 36PEAK_REDUCTION
SITE-SE3-00547-PVSOLARSolis 40 kWp array40 kWp40 kWKommunfastigheter ABONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 76 kW
Option ARun compute3.20 SEK/kWh
Kraftnod Marketplace net 9.47 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
—
Grid limit
112 kW
Building load
36 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE36 kW
SolarIDLE0 kW
GridIMPORT41.4 kW

Site value

Last 30 days · simulated
Compute33 011 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization548 SEK
Total site value33 559 SEK / month
Energy cost−880 SEK
Net site value32 679 SEK