Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE3
SITE-SE3-00533
Residence Örebro. The control plane steers the whole site — not just the GPUs.
Location
Örebro
Grid area SE3
Grid connection
30 A
13 kW available
Internet
Fiber 1 Gbit
Site owner
Privat host
Agent AGENT-SE3-00533
Site topology
Grid · import 6.7 kW
SITE-SE3-00533
GPU CLUSTER
1 GPU
RUN · 0.7 kW
BUILDING LOAD
3 kW
BASELINE · 3 kW
BATTERY
15 kWh
IDLE · 0 kW
SOLAR
12 kWp
IDLE · 0 kW
EV CHARGER
1 chargers
LIMIT · 3 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE3-00533-GPU | GPU_CLUSTER | NVIDIA RTX 6000 Ada | 1 GPU | 0.8 kW | Host-owned | OFFLINE | powerKw 0.1 · utilPct 0 · tempC 16 · inUse 0 | COMPUTE |
| SITE-SE3-00533-GRID | GRID_CONNECTION | DSO 30 A main fuse | 21 kW | 21 kW | Privat host | ONLINE | importKw 0 | — |
| SITE-SE3-00533-LOAD | BUILDING_LOAD | — Building load | 3 kW | 3 kW | Privat host | ONLINE | powerKw 3 | PEAK_REDUCTION |
| SITE-SE3-00533-BAT | BATTERY | BYD 15 kWh LFP | 15 kWh | 8 kW | Privat host | ONLINE | socPct 72 · powerKw 0 · mode idle | FCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY |
| SITE-SE3-00533-PV | SOLAR | Fronius 12 kWp array | 12 kWp | 12 kW | Privat host | ONLINE | powerKw 0 | SPOT_ENERGY |
| SITE-SE3-00533-EV | EV_CHARGER | Zaptec 1 × 11 kW | 1 chargers | 11 kW | Privat host | ONLINE | powerKw 6 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 10 kW
Option ARun compute3.42 SEK/kWh
Kraftnod Marketplace net 8.43 SEK/GPU-h × demand 34%
Option BCharge battery0.71 SEK/kWh
Shift to evening peak 1.35 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.68 SEK/kWh
FCR 420 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.54 SEK/kWh
- Evening peak
- 1.35 SEK/kWh
- Battery SOC
- 72%
- Grid limit
- 13 kW
- Building load
- 3 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 0.7 kW |
| Building load | BASELINE | 3 kW |
| Battery | IDLE | 0 kW |
| Solar | IDLE | 0 kW |
| EV charging | LIMIT | 3 kW |
| Grid | IMPORT | 6.7 kW |
Site value
Compute0 SEK
Battery flex2 104 SEK
Peak reduction550 SEK
Solar optimization154 SEK
Total site value2 808 SEK / month
Energy cost−−0 SEK
Net site value2 808 SEK