Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE3
SITE-SE3-00526
Handelshuset AB – Linköping. The control plane steers the whole site — not just the GPUs.
Location
Linköping
Grid area SE3
Grid connection
160 A
72 kW available
Internet
Fiber 10 Gbit
Site owner
Handelshuset AB
Agent AGENT-SE3-00526
Site topology
Grid · import 69.4 kW
SITE-SE3-00526
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
38 kW
BASELINE · 38 kW
EV CHARGER
8 chargers
LIMIT · 26 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE3-00526-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 4 · utilPct 68 · tempC 18 · inUse 5 | COMPUTE |
| SITE-SE3-00526-GRID | GRID_CONNECTION | DSO 160 A main fuse | 110 kW | 110 kW | Handelshuset AB | ONLINE | importKw 0 | — |
| SITE-SE3-00526-LOAD | BUILDING_LOAD | — Building load | 38 kW | 38 kW | Handelshuset AB | ONLINE | powerKw 38 | PEAK_REDUCTION |
| SITE-SE3-00526-EV | EV_CHARGER | Easee 8 × 11 kW | 8 chargers | 88 kW | Handelshuset AB | ONLINE | powerKw 20 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 34 kW
Option ARun compute3.20 SEK/kWh
Kraftnod Marketplace net 9.47 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.54 SEK/kWh
- Evening peak
- 1.35 SEK/kWh
- Battery SOC
- —
- Grid limit
- 72 kW
- Building load
- 38 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 38 kW |
| EV charging | LIMIT | 26 kW |
| Grid | IMPORT | 69.4 kW |
Site value
Compute27 414 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value27 414 SEK / month
Energy cost−841 SEK
Net site value26 573 SEK