Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE3

SITE-SE3-00512

Handelshuset AB – Uppsala. The control plane steers the whole site — not just the GPUs.

Location
Uppsala
Grid area SE3
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Handelshuset AB
Agent AGENT-SE3-00512

Site topology

Grid · import 42.7 kW
SITE-SE3-00512
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
33 kW
BASELINE · 33 kW
SOLAR
40 kWp
IDLE · 0 kW
EV CHARGER
2 chargers
LIMIT · 7 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE3-00512-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada4 GPU3 kWFinance Partner Fund IONLINEpowerKw 1.3 · utilPct 41 · tempC 20 · inUse 2COMPUTE
SITE-SE3-00512-GRIDGRID_CONNECTIONDSO 400 A main fuse276 kW276 kWHandelshuset ABONLINEimportKw 0—
SITE-SE3-00512-LOADBUILDING_LOAD— Building load33 kW33 kWHandelshuset ABONLINEpowerKw 33PEAK_REDUCTION
SITE-SE3-00512-PVSOLARSolis 40 kWp array40 kWp40 kWHandelshuset ABONLINEpowerKw 0SPOT_ENERGY
SITE-SE3-00512-EVEV_CHARGERZaptec 2 × 11 kW2 chargers22 kWHandelshuset ABONLINEpowerKw 5PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 146 kW
Option ARun compute3.42 SEK/kWh
Kraftnod Marketplace net 8.43 SEK/GPU-h × demand 34%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.54 SEK/kWh
Evening peak
1.35 SEK/kWh
Battery SOC
—
Grid limit
179 kW
Building load
33 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE33 kW
SolarIDLE0 kW
EV chargingLIMIT7 kW
GridIMPORT42.7 kW

Site value

Last 30 days · simulated
Compute9 772 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization566 SEK
Total site value10 338 SEK / month
Energy cost−353 SEK
Net site value9 985 SEK