Site · SE3
SITE-SE3-00505
Kommunfastigheter AB – Göteborg. The control plane steers the whole site — not just the GPUs.
Location
Göteborg
Grid area SE3
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE3-00505
Site topology
Grid · import 51.7 kW
SITE-SE3-00505
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
49 kW
BASELINE · 49 kW
BATTERY
100 kWh
IDLE · 0 kW
SOLAR
80 kWp
IDLE · 0 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE3-00505-GPU | GPU_CLUSTER | NVIDIA RTX 6000 Ada | 4 GPU | 3 kW | Finance Partner Fund I | ONLINE | powerKw 1.7 · utilPct 55 · tempC 23 · inUse 2 | COMPUTE |
| SITE-SE3-00505-GRID | GRID_CONNECTION | DSO 250 A main fuse | 173 kW | 173 kW | Kommunfastigheter AB | ONLINE | importKw 0 | — |
| SITE-SE3-00505-LOAD | BUILDING_LOAD | — Building load | 49 kW | 49 kW | Kommunfastigheter AB | ONLINE | powerKw 49 | PEAK_REDUCTION |
| SITE-SE3-00505-BAT | BATTERY | Huawei 100 kWh LFP | 100 kWh | 50 kW | Kommunfastigheter AB | ONLINE | socPct 55 · powerKw 0 · mode idle | FCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY |
| SITE-SE3-00505-PV | SOLAR | Solis 80 kWp array | 80 kWp | 80 kW | Kommunfastigheter AB | ONLINE | powerKw 0 | SPOT_ENERGY |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 63 kW
Option ARun compute3.42 SEK/kWh
Kraftnod Marketplace net 8.43 SEK/GPU-h × demand 34%
Option BCharge battery0.71 SEK/kWh
Shift to evening peak 1.35 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.68 SEK/kWh
FCR 420 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.54 SEK/kWh
- Evening peak
- 1.35 SEK/kWh
- Battery SOC
- 55%
- Grid limit
- 112 kW
- Building load
- 49 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 2.7 kW |
| Building load | BASELINE | 49 kW |
| Battery | IDLE | 0 kW |
| Solar | IDLE | 0 kW |
| Grid | IMPORT | 51.7 kW |
Site value
Compute10 041 SEK
Battery flex11 755 SEK
Peak reduction3 080 SEK
Solar optimization1 147 SEK
Total site value26 023 SEK / month
Energy cost−315 SEK
Net site value25 708 SEK