Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE2
SITE-SE2-00820
Industripark Väst AB – Östersund. The control plane steers the whole site — not just the GPUs.
Location
Östersund
Grid area SE2
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE2-00820
Site topology
Grid · import 37.4 kW
SITE-SE2-00820
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
32 kW
BASELINE · 32 kW
SOLAR
40 kWp
IDLE · 0 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE2-00820-GPU | GPU_CLUSTER | NVIDIA RTX PRO 6000 Blackwell | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 1 · utilPct 6 · tempC 24 · inUse 0 | COMPUTE |
| SITE-SE2-00820-GRID | GRID_CONNECTION | DSO 400 A main fuse | 276 kW | 276 kW | Industripark Väst AB | ONLINE | importKw 0 | — |
| SITE-SE2-00820-LOAD | BUILDING_LOAD | — Building load | 32 kW | 32 kW | Industripark Väst AB | ONLINE | powerKw 32 | PEAK_REDUCTION |
| SITE-SE2-00820-PV | SOLAR | Fronius 40 kWp array | 40 kWp | 40 kW | Industripark Väst AB | ONLINE | powerKw 0 | SPOT_ENERGY |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 147 kW
Option ARun compute6.72 SEK/kWh
Kraftnod Marketplace net 14.93 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.24 SEK/kWh
- Evening peak
- 0.60 SEK/kWh
- Battery SOC
- —
- Grid limit
- 179 kW
- Building load
- 32 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 32 kW |
| Solar | IDLE | 0 kW |
| Grid | IMPORT | 37.4 kW |
Site value
Compute0 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization515 SEK
Total site value515 SEK / month
Energy cost−−0 SEK
Net site value515 SEK
