Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE2

SITE-SE2-00820

Industripark Väst AB – Östersund. The control plane steers the whole site — not just the GPUs.

Location
Östersund
Grid area SE2
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE2-00820

Site topology

Grid · import 37.4 kW
SITE-SE2-00820
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
32 kW
BASELINE · 32 kW
SOLAR
40 kWp
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE2-00820-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell8 GPU6 kWKraftnod AssetCo 01ONLINEpowerKw 1 · utilPct 6 · tempC 24 · inUse 0COMPUTE
SITE-SE2-00820-GRIDGRID_CONNECTIONDSO 400 A main fuse276 kW276 kWIndustripark Väst ABONLINEimportKw 0—
SITE-SE2-00820-LOADBUILDING_LOAD— Building load32 kW32 kWIndustripark Väst ABONLINEpowerKw 32PEAK_REDUCTION
SITE-SE2-00820-PVSOLARFronius 40 kWp array40 kWp40 kWIndustripark Väst ABONLINEpowerKw 0SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 147 kW
Option ARun compute6.72 SEK/kWh
Kraftnod Marketplace net 14.93 SEK/GPU-h × demand 35%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.24 SEK/kWh
Evening peak
0.60 SEK/kWh
Battery SOC
—
Grid limit
179 kW
Building load
32 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE32 kW
SolarIDLE0 kW
GridIMPORT37.4 kW

Site value

Last 30 days · simulated
Compute0 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization515 SEK
Total site value515 SEK / month
Energy cost−−0 SEK
Net site value515 SEK