Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE2
SITE-SE2-00785
Nordisk Logistik AB – Umeå. The control plane steers the whole site — not just the GPUs.
Location
Umeå
Grid area SE2
Grid connection
160 A
72 kW available
Internet
Fiber 10 Gbit
Site owner
Nordisk Logistik AB
Agent AGENT-SE2-00785
Site topology
Grid · import 58.4 kW
SITE-SE2-00785
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
40 kW
BASELINE · 40 kW
SOLAR
40 kWp
IDLE · 0 kW
EV CHARGER
4 chargers
LIMIT · 13 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE2-00785-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Kraftnod AssetCo 02 | MAINTENANCE | powerKw 0.7 · utilPct 0 · tempC 19 · inUse 0 | COMPUTE |
| SITE-SE2-00785-GRID | GRID_CONNECTION | DSO 160 A main fuse | 110 kW | 110 kW | Nordisk Logistik AB | ONLINE | importKw 0 | — |
| SITE-SE2-00785-LOAD | BUILDING_LOAD | — Building load | 40 kW | 40 kW | Nordisk Logistik AB | ONLINE | powerKw 40 | PEAK_REDUCTION |
| SITE-SE2-00785-PV | SOLAR | Fronius 40 kWp array | 40 kWp | 40 kW | Nordisk Logistik AB | ONLINE | powerKw 0 | SPOT_ENERGY |
| SITE-SE2-00785-EV | EV_CHARGER | Zaptec 4 × 11 kW | 4 chargers | 44 kW | Nordisk Logistik AB | ONLINE | powerKw 17 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 32 kW
Option ARun compute3.50 SEK/kWh
Kraftnod Marketplace net 9.7 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.24 SEK/kWh
- Evening peak
- 0.60 SEK/kWh
- Battery SOC
- —
- Grid limit
- 72 kW
- Building load
- 40 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 40 kW |
| Solar | IDLE | 0 kW |
| EV charging | LIMIT | 13 kW |
| Grid | IMPORT | 58.4 kW |
Site value
Compute0 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization525 SEK
Total site value525 SEK / month
Energy cost−−0 SEK
Net site value525 SEK