Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE2
SITE-SE2-00722
Kommunfastigheter AB – Umeå. The control plane steers the whole site — not just the GPUs.
Location
Umeå
Grid area SE2
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE2-00722
Site topology
Grid · import 34.7 kW
SITE-SE2-00722
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
32 kW
BASELINE · 32 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE2-00722-GPU | GPU_CLUSTER | NVIDIA L40S | 4 GPU | 3 kW | Finance Partner Fund I | ONLINE | powerKw 2.1 · utilPct 74 · tempC 24 · inUse 3 | COMPUTE |
| SITE-SE2-00722-GRID | GRID_CONNECTION | DSO 400 A main fuse | 276 kW | 276 kW | Kommunfastigheter AB | ONLINE | importKw 0 | — |
| SITE-SE2-00722-LOAD | BUILDING_LOAD | — Building load | 32 kW | 32 kW | Kommunfastigheter AB | ONLINE | powerKw 32 | PEAK_REDUCTION |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 147 kW
Option ARun compute3.50 SEK/kWh
Kraftnod Marketplace net 9.7 SEK/GPU-h × demand 28%
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.24 SEK/kWh
- Evening peak
- 0.60 SEK/kWh
- Battery SOC
- —
- Grid limit
- 179 kW
- Building load
- 32 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 2.7 kW |
| Building load | BASELINE | 32 kW |
| Grid | IMPORT | 34.7 kW |
Site value
Compute17 742 SEK
Battery flex0 SEK
Peak reduction0 SEK
Solar optimization0 SEK
Total site value17 742 SEK / month
Energy cost−221 SEK
Net site value17 521 SEK