Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE2

SITE-SE2-00701

Residence Sundsvall. The control plane steers the whole site — not just the GPUs.

Location
Sundsvall
Grid area SE2
Grid connection
35 A
16 kW available
Internet
Fiber 1 Gbit
Site owner
Privat host
Agent AGENT-SE2-00701

Site topology

Grid · import 6.7 kW
SITE-SE2-00701
GPU CLUSTER
4 GPU
RUN · 2.7 kW
BUILDING LOAD
4 kW
BASELINE · 4 kW
BATTERY
15 kWh
IDLE · 0 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE2-00701-GPUGPU_CLUSTERNVIDIA RTX 6000 Ada4 GPU3 kWFinance Partner Fund IMAINTENANCEpowerKw 0.4 · utilPct 0 · tempC 21 · inUse 0COMPUTE
SITE-SE2-00701-GRIDGRID_CONNECTIONDSO 35 A main fuse24 kW24 kWPrivat hostONLINEimportKw 0—
SITE-SE2-00701-LOADBUILDING_LOAD— Building load4 kW4 kWPrivat hostONLINEpowerKw 4PEAK_REDUCTION
SITE-SE2-00701-BATBATTERYBYD 15 kWh LFP15 kWh8 kWPrivat hostONLINEsocPct 41 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 12 kW
Option ARun compute3.72 SEK/kWh
Kraftnod Marketplace net 8.66 SEK/GPU-h × demand 34%
Option BCharge battery0.32 SEK/kWh
Shift to evening peak 0.60 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.51 SEK/kWh
FCR 378 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.24 SEK/kWh
Evening peak
0.60 SEK/kWh
Battery SOC
41%
Grid limit
16 kW
Building load
4 kW

Dispatch

AssetActionPower
GPU clusterRUN2.7 kW
Building loadBASELINE4 kW
BatteryIDLE0 kW
GridIMPORT6.7 kW

Site value

Last 30 days · simulated
Compute0 SEK
Battery flex1 782 SEK
Peak reduction519 SEK
Solar optimization0 SEK
Total site value2 301 SEK / month
Energy cost−−0 SEK
Net site value2 301 SEK