Kraftnod – Nordic Distributed Data Center
Kraftnod Platform
Control plane for distributed energy & compute
Demo · simulated data
← Sites
Site · SE2

SITE-SE2-00596

Example Fastigheter AB – Östersund. The control plane steers the whole site — not just the GPUs.

Location
Östersund
Grid area SE2
Grid connection
250 A
112 kW available
Internet
Fiber 10 Gbit
Site owner
Example Fastigheter AB
Agent AGENT-SE2-00596

Site topology

Grid · import 51.4 kW
SITE-SE2-00596
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
39 kW
BASELINE · 39 kW
BATTERY
400 kWh
IDLE · 0 kW
SOLAR
150 kWp
IDLE · 0 kW
EV CHARGER
2 chargers
LIMIT · 7 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE2-00596-GPUGPU_CLUSTERNVIDIA RTX PRO 6000 Blackwell8 GPU6 kWKraftnod AssetCo 02ONLINEpowerKw 3.6 · utilPct 59 · tempC 19 · inUse 5COMPUTE
SITE-SE2-00596-GRIDGRID_CONNECTIONDSO 250 A main fuse173 kW173 kWExample Fastigheter ABONLINEimportKw 0—
SITE-SE2-00596-LOADBUILDING_LOAD— Building load39 kW39 kWExample Fastigheter ABONLINEpowerKw 39PEAK_REDUCTION
SITE-SE2-00596-BATBATTERYHuawei 400 kWh LFP400 kWh200 kWExample Fastigheter ABONLINEsocPct 37 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY
SITE-SE2-00596-PVSOLARFronius 150 kWp array150 kWp150 kWExample Fastigheter ABONLINEpowerKw 0SPOT_ENERGY
SITE-SE2-00596-EVEV_CHARGERZaptec 2 × 11 kW2 chargers22 kWExample Fastigheter ABONLINEpowerKw 1PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 73 kW
Option ARun compute6.72 SEK/kWh
Kraftnod Marketplace net 14.93 SEK/GPU-h × demand 35%
Option BCharge battery0.32 SEK/kWh
Shift to evening peak 0.60 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.51 SEK/kWh
FCR 378 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.24 SEK/kWh
Evening peak
0.60 SEK/kWh
Battery SOC
37%
Grid limit
112 kW
Building load
39 kW

Dispatch

AssetActionPower
GPU clusterRUN5.4 kW
Building loadBASELINE39 kW
BatteryIDLE0 kW
SolarIDLE0 kW
EV chargingLIMIT7 kW
GridIMPORT51.4 kW

Site value

Last 30 days · simulated
Compute45 347 SEK
Battery flex47 914 SEK
Peak reduction13 944 SEK
Solar optimization2 012 SEK
Total site value109 217 SEK / month
Energy cost−401 SEK
Net site value108 816 SEK