Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE2
SITE-SE2-00582
Kommunfastigheter AB – Östersund. The control plane steers the whole site — not just the GPUs.
Location
Östersund
Grid area SE2
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE2-00582
Site topology
Grid · import 99.4 kW
SITE-SE2-00582
GPU CLUSTER
8 GPU
POWER_CAP · 5.4 kW
BUILDING LOAD
68 kW
BASELINE · 68 kW
BATTERY
200 kWh
IDLE · 0 kW
EV CHARGER
8 chargers
LIMIT · 26 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE2-00582-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Kraftnod AssetCo 02 | CURTAILED | powerKw 0.7 · utilPct 0 · tempC 25 · inUse 0 | COMPUTE |
| SITE-SE2-00582-GRID | GRID_CONNECTION | DSO 400 A main fuse | 276 kW | 276 kW | Kommunfastigheter AB | ONLINE | importKw 0 | — |
| SITE-SE2-00582-LOAD | BUILDING_LOAD | — Building load | 68 kW | 68 kW | Kommunfastigheter AB | ONLINE | powerKw 68 | PEAK_REDUCTION |
| SITE-SE2-00582-BAT | BATTERY | Dyness 200 kWh LFP | 200 kWh | 100 kW | Kommunfastigheter AB | ONLINE | socPct 56 · powerKw 0 · mode idle | FCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY |
| SITE-SE2-00582-EV | EV_CHARGER | Zaptec 8 × 11 kW | 8 chargers | 88 kW | Kommunfastigheter AB | ONLINE | powerKw 44 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 111 kW
Option ARun compute3.50 SEK/kWh
Kraftnod Marketplace net 9.7 SEK/GPU-h × demand 28%
Option BCharge battery0.32 SEK/kWh
Shift to evening peak 0.60 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.51 SEK/kWh
FCR 378 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.24 SEK/kWh
- Evening peak
- 0.60 SEK/kWh
- Battery SOC
- 56%
- Grid limit
- 179 kW
- Building load
- 68 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | POWER_CAP | 5.4 kW |
| Building load | BASELINE | 68 kW |
| Battery | IDLE | 0 kW |
| EV charging | LIMIT | 26 kW |
| Grid | IMPORT | 99.4 kW |
Site value
Compute0 SEK
Battery flex21 463 SEK
Peak reduction6 246 SEK
Solar optimization0 SEK
Total site value27 709 SEK / month
Energy cost−−0 SEK
Net site value27 709 SEK