Site · SE2

SITE-SE2-00582

Kommunfastigheter AB – Östersund. The control plane steers the whole site — not just the GPUs.

Location
Östersund
Grid area SE2
Grid connection
400 A
179 kW available
Internet
Fiber 10 Gbit
Site owner
Kommunfastigheter AB
Agent AGENT-SE2-00582

Site topology

Grid · import 99.4 kW
SITE-SE2-00582
GPU CLUSTER
8 GPU
POWER_CAP · 5.4 kW
BUILDING LOAD
68 kW
BASELINE · 68 kW
BATTERY
200 kWh
IDLE · 0 kW
EV CHARGER
8 chargers
LIMIT · 26 kW

Assets and ownership

AssetTypeMake / modelCapacityPowerOwnerStatusTelemetryMarkets
SITE-SE2-00582-GPUGPU_CLUSTERNVIDIA L40S8 GPU6 kWKraftnod AssetCo 02CURTAILEDpowerKw 0.7 · utilPct 0 · tempC 25 · inUse 0COMPUTE
SITE-SE2-00582-GRIDGRID_CONNECTIONDSO 400 A main fuse276 kW276 kWKommunfastigheter ABONLINEimportKw 0—
SITE-SE2-00582-LOADBUILDING_LOAD— Building load68 kW68 kWKommunfastigheter ABONLINEpowerKw 68PEAK_REDUCTION
SITE-SE2-00582-BATBATTERYDyness 200 kWh LFP200 kWh100 kWKommunfastigheter ABONLINEsocPct 56 · powerKw 0 · mode idleFCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY
SITE-SE2-00582-EVEV_CHARGERZaptec 8 × 11 kW8 chargers88 kWKommunfastigheter ABONLINEpowerKw 44PEAK_REDUCTION, MFRR

Each asset can have its own owner. Control plane: Kraftnod.

Maximize value per connected kW

Kraftnod Optimizer — decision

Simulated
Available site power: 111 kW
Option ARun compute3.50 SEK/kWh
Kraftnod Marketplace net 9.7 SEK/GPU-h × demand 28%
Option BCharge battery0.32 SEK/kWh
Shift to evening peak 0.60 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.51 SEK/kWh
FCR 378 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
Spot now
0.24 SEK/kWh
Evening peak
0.60 SEK/kWh
Battery SOC
56%
Grid limit
179 kW
Building load
68 kW

Dispatch

AssetActionPower
GPU clusterPOWER_CAP5.4 kW
Building loadBASELINE68 kW
BatteryIDLE0 kW
EV chargingLIMIT26 kW
GridIMPORT99.4 kW

Site value

Last 30 days · simulated
Compute0 SEK
Battery flex21 463 SEK
Peak reduction6 246 SEK
Solar optimization0 SEK
Total site value27 709 SEK / month
Energy cost−−0 SEK
Net site value27 709 SEK