Kraftnod Platform
Control plane for distributed energy & compute
← Sites
Simulated
Last 30 days · simulated
Site · SE1
SITE-SE1-00568
Industripark Väst AB – Luleå. The control plane steers the whole site — not just the GPUs.
Location
Luleå
Grid area SE1
Grid connection
125 A
56 kW available
Internet
Fiber 10 Gbit
Site owner
Industripark Väst AB
Agent AGENT-SE1-00568
Site topology
Grid · import 41.4 kW
SITE-SE1-00568
GPU CLUSTER
8 GPU
RUN · 5.4 kW
BUILDING LOAD
29 kW
BASELINE · 29 kW
BATTERY
400 kWh
IDLE · 0 kW
SOLAR
80 kWp
IDLE · 0 kW
EV CHARGER
2 chargers
LIMIT · 7 kW
Assets and ownership
| Asset | Type | Make / model | Capacity | Power | Owner | Status | Telemetry | Markets |
|---|---|---|---|---|---|---|---|---|
| SITE-SE1-00568-GPU | GPU_CLUSTER | NVIDIA L40S | 8 GPU | 6 kW | Kraftnod AssetCo 01 | ONLINE | powerKw 2.4 · utilPct 34 · tempC 22 · inUse 3 | COMPUTE |
| SITE-SE1-00568-GRID | GRID_CONNECTION | DSO 125 A main fuse | 86 kW | 86 kW | Industripark Väst AB | ONLINE | importKw 0 | — |
| SITE-SE1-00568-LOAD | BUILDING_LOAD | — Building load | 29 kW | 29 kW | Industripark Väst AB | ONLINE | powerKw 29 | PEAK_REDUCTION |
| SITE-SE1-00568-BAT | BATTERY | Dyness 400 kWh LFP | 400 kWh | 200 kW | Industripark Väst AB | ONLINE | socPct 78 · powerKw 0 · mode idle | FCR, AFRR, MFRR, PEAK_REDUCTION, SPOT_ENERGY |
| SITE-SE1-00568-PV | SOLAR | Fronius 80 kWp array | 80 kWp | 80 kW | Industripark Väst AB | ONLINE | powerKw 0 | SPOT_ENERGY |
| SITE-SE1-00568-EV | EV_CHARGER | Zaptec 2 × 11 kW | 2 chargers | 22 kW | Industripark Väst AB | ONLINE | powerKw 4 | PEAK_REDUCTION, MFRR |
Each asset can have its own owner. Control plane: Kraftnod.
Maximize value per connected kW
Kraftnod Optimizer — decision
Available site power: 27 kW
Option ARun compute3.53 SEK/kWh
Kraftnod Marketplace net 9.72 SEK/GPU-h × demand 28%
Option BCharge battery0.28 SEK/kWh
Shift to evening peak 0.53 SEK/kWh, 88% round-trip
Option CReserve battery for FCR1.34 SEK/kWh
FCR 336 SEK/MW/h, 0.25 h energy reserve
Option DIdle / grid only0.00 SEK/kWh
Baseline
DecisionRUN COMPUTE
- Spot now
- 0.21 SEK/kWh
- Evening peak
- 0.53 SEK/kWh
- Battery SOC
- 78%
- Grid limit
- 56 kW
- Building load
- 29 kW
Dispatch
| Asset | Action | Power |
|---|---|---|
| GPU cluster | RUN | 5.4 kW |
| Building load | BASELINE | 29 kW |
| Battery | IDLE | 0 kW |
| Solar | IDLE | 0 kW |
| EV charging | LIMIT | 7 kW |
| Grid | IMPORT | 41.4 kW |
Site value
Compute17 572 SEK
Battery flex38 828 SEK
Peak reduction12 712 SEK
Solar optimization1 115 SEK
Total site value70 227 SEK / month
Energy cost−267 SEK
Net site value69 960 SEK
